Information Details

Back

Circular No: M&P/112/05/SJ

8 May 2020

Resumption of work after Circuit Breaker

With 1 June 2020 slated to be the end-date of circuit breaker in Singapore, many construction companies are looking forward to resuming work on sites.

SCAL has been working closely with the relevant authorities to chart out practical approaches and measures to re-start construction projects in a gradual and safe manner, especially to reduce the possibility of a second wave of virus transmission among construction workers.

We have been advised that the following should be considered in re-start plans:

  • Safe Worker Accommodation
  • Safe Worksite
  • Safe Transport

Please refer to the attached letter from SCAL President Mr Ng Yek Meng.

We will share with members once the details have been developed. Meanwhile we would like to advise members to take this time to review the processes of their projects and be prepared to implement the necessary measures to ensure Covid-safe worksites.

If companies have any issues, please contact us via email: enquiry@scal.com.sg or mobile: 88189577

Back